DC Contracting Case Study
DC Contracting is a company based out of Texas that took on a project in the Post Oak area of Houston. They were hired to redo the garage parking lot floor during the middle of summer when heat conditions were at their peak.
Mass pours & Thermal Control Plan
A thermal control plan for mass concrete pours is crucial to ensure that the early-age concrete is curing under favorable temperature conditions. By monitoring the in-place temperature of both, the core and surface of a concrete mass placement, General Contractors are able to determine if the concrete mix is curing properly.
Webber Texas Department of Transportation
At a glance, Customer leveraged sensor data through time ensuring DOT compliance with thermal plan, enhancing safety, and tracking performance. Thereby significantly reducing owner liability and accelerating timeline.
Harvey Builders Crown Castle HQ
The contractor experienced a three-week project delay due to low cylinder break results from third-party testing labs. Our real-time monitoring, revealed that the concrete consistently met the specified strength within 10 hours of pouring, contrary to the third-party lab’s findings.
DPH – Precast
At a glance, The customer seeks to boost production, a challenge with their current system. Our data eliminated the need for the traditional wait times enabling quick mix design optimization, product improvements, and increases in production.
Houston Airport System Bush Intercontinental Airport
At a glance, To address costly delays and operational disruptions from runway shutdowns, the customer integrated our real-time performance monitoring, expediting repairs with improved precision, safety, and cost efficiency.
PC Solana – Precast
At a glance, Facing material and labor shortages, the customer sought ways to cut cement usage and boost labor efficiency. Our data allowed for testing various admixtures, reducing material cost, and allowing their labor force to focus on more valuable tasks.